Obtaining a Permit - UBPR
UBPR will develop all documentation for a building permit within the framework of all regulations and requirements

What are you planning to build?

In which price segment do you see your structure?

What would you like to decorate the facade of the building?

What size canopy would you like?

Width м
Length м

What material would you like to make the roof from?

What area do you want to build a structure?

Area of ​​all floors м2.
The area of ​​all floors according to the area of ​​the building м2.
Percentage of sections of the same type %

Finish!
Thank you for your attention

ПП «Укрбудпроектреставрація»
+38 067 468-44-64

Area м2
Enter the number
existing calculation
Calculation number
The cost of the project from UAH toUAH
Construction cost from UAH toUAH

Please leave your phone number and we will call you to confirm your discount and provide additional information

Why do you need a building permit?
Construction is always associated with many legislative requirements and administrative red tape. And in order to obtain the relevant documents, knowledge of the specifics of the process and time are required. That is why for more than 12 years, UBPR has been helping to issue a wide variety of construction documents necessary for those wishing to build an object of any complexity category.
How much does a construction permit cost in Ukraine?
The cost of preparing documents for obtaining a permit depends on many factors:
  • whether or not the owner has complete documentation (depends on the type of object);
  • locations;
  • plot area;
  • number of floors and total area of ​​the facility;
  • construction of a new object or reconstruction of an existing one;
  • construction dates of the facility;
  • complexities of engineering and design works.
In order to issue a building permit correctly and as quickly as possible, we recommend contacting professionalsUBPR.
Construction permit and classes of consequences
res_project

Buildings and structures are divided into classes according to the following characteristics:

  • insignificant level of consequences of CC1 (previously 1st and 2nd class);
  • average level of consequences of SS2 (previously 3rd and 4th class);
  • significant consequences CC3 (formerly 5th grade)

For each class of consequences, there is an algorithm for obtaining permission.

Certificates
We have all the necessary documents for the work we offer
In order to order a construction permit and spend a minimum of time and effort on it, contact the UBPR
It only takes a few minutes to call or write to us and order a building permit.

We will provide you with any information in this area, invite you to the office to sign the contract and discuss payment terms convenient for you.

 
As a result, you will get
  • agreement Construction approval in all authorities
  • Commissioning Time savings on paperwork
  • documentation Full set of documents for a building permit
Have additional questions?
Write to us or leave a request and we will call you back when it is convenient for you.