{"id":1443,"date":"2020-03-20T14:06:06","date_gmt":"2020-03-20T12:06:06","guid":{"rendered":"https:\/\/ubpr.com.ua.com.ua\/?page_id=1443"},"modified":"2020-09-02T09:27:12","modified_gmt":"2020-09-02T07:27:12","slug":"building-permit","status":"publish","type":"page","link":"https:\/\/ubpr.com.ua\/en\/building-permit\/","title":{"rendered":"Construction permit"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">During the construction of buildings and structures of the CC1 category, a &#8220;notice of the start of construction work&#8221; is submitted to the architectural inspection<\/span><span style=\"font-weight: 400;\">(through the developer&#8217;s electronic office or through the &#8220;Transparent Office&#8221; TsNAP)<\/span><span style=\"font-weight: 400;\">. The message is registered within 10 working days<\/span><span style=\"font-weight: 400;\">, after which<\/span><span style=\"font-weight: 400;\">the developer is notified of a unique number or a &#8220;Rejection&#8221; of registration is sent.<\/span><br \/>\n<span style=\"font-weight: 400;\">After eliminating the comments indicated in the refusal, the notification can be submitted to the inspection again. Please note that in this case, construction work can be started on the second day after the document is sent or a description of its acceptance is issued to the &#8220;Transparent Office&#8221; TsNAP, as it is of a notification nature. If the class is defined as SS2, the documents are also submitted to DABA. However, in this case, it is necessary to have a working project and, in some cases, passing the state. examinations<\/span><\/p>\n<h3><strong>In the event that class SS2, SS3, the following documents are submitted to the DABA:<\/strong><\/h3>\n<ul>\n<li>statement of the established model;<\/li>\n<li>documents for the land plot (right of ownership or use);<\/li>\n<li>project documentation for the execution of construction works, which has passed the examination;<\/li>\n<li>a copy of the building title if the existing building is being renovated. If the documents are not submitted by the owner of the building, then his written consent may be required;<\/li>\n<li>the original and a copy of the contractor&#8217;s construction license;<\/li>\n<li>copies of documents on the appointment of the author and technical supervision of the construction;<\/li>\n<li>a notarized copy of the qualification certificates of designers and engineers of authorship and technical supervision of construction.<\/li>\n<\/ul>\n<h3><strong>Penalties for breaking the law<\/strong><\/h3>\n<p><strong>Art. 96 KUPAP<\/strong>Violation of the requirements of legislation, construction regulations, standards and rules during construction<\/p>\n<table border=\"1\" cellpadding=\"0\" cellspacing=\"0\" dir=\"ltr\">\n<colgroup>\n<col width=\"248\"\/>\n<col width=\"302\"\/>\n<col width=\"220\"\/><\/colgroup>\n<tbody>\n<tr>\n<td colspan=\"1\" data-sheets-value='{\"1\":2,\"2\":\"\u0421\u0443\u0431\u2019\u0454\u043a\u0442\u0438 \u043c\u0456\u0441\u0442\u043e\u0431\u0443\u0434\u0443\u0432\u0430\u043d\u043d\u044f, \u044f\u043a\u0456 \u0454 \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u0430\u043c\u0438 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 (\u0443 \u0440\u0430\u0437\u0456 \u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u043c\u0456\u0441\u0442\u043e\u0431\u0443\u0434\u0456\u0432\u043d\u043e\u0457 \u0434\u0456\u044f\u043b\u044c\u043d\u043e\u0441\u0442\u0456), \u0430\u0431\u043e \u0442\u0456, \u0449\u043e \u0432\u0438\u043a\u043e\u043d\u0443\u044e\u0442\u044c \u0444\u0443\u043d\u043a\u0446\u0456\u0457 \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u0430 \u0456 \u043f\u0456\u0434\u0440\u044f\u0434\u043d\u0438\u043a\u0430 \u043e\u0434\u043d\u043e\u0447\u0430\u0441\u043d\u043e\"}' rowspan=\"11\">\n<div>Urban planning entities that are customers of the construction of objects (in the case of urban planning activities), or those that perform the functions of a customer and a contractor at the same time<\/div>\n<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 1) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u043f\u0456\u0434\u0433\u043e\u0442\u043e\u0432\u0447\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f, \u0430 \u0442\u0430\u043a\u043e\u0436 \u043d\u0430\u0432\u0435\u0434\u0435\u043d\u043d\u044f \u043d\u0435\u0434\u043e\u0441\u0442\u043e\u0432\u0456\u0440\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445 \u0443 \u0442\u0430\u043a\u043e\u043c\u0443 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u0456\"}'>p. 1) execution of preparatory works without notification of the start of their implementation, as well as providing inaccurate data in such notification<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"10 \u043f\u043c\\n\u0437 01.01.20 \u2013 41 730\"}'>10 pm<br \/>\nfrom 01.01.20 \u2013 41,730<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f.2) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f, \u0430 \u0442\u0430\u043a\u043e\u0436 \u043d\u0430\u0432\u0435\u0434\u0435\u043d\u043d\u044f \u043d\u0435\u0434\u043e\u0441\u0442\u043e\u0432\u0456\u0440\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445 \u0443 \u0442\u0430\u043a\u043e\u043c\u0443 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u0456, \u0432\u0447\u0438\u043d\u0435\u043d\u0435 \u0449\u043e\u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u043d\u0435\u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04211)\"}'>p.2) execution of construction works without notification of the start of their implementation, as well as providing inaccurate data in such a notification, made in relation to objects that, according to the class of consequences (responsibility), belong to objects with minor consequences (\u0421\u04211)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"36 \u043f\u043c\\n\u0437 01.01.20 \u2013 150 228\"}'>36 pm<br \/>\nfrom 01.01.20 \u2013 150,228<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 3) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043e\u0442\u0440\u0438\u043c\u0430\u043d\u043d\u044f \u0434\u043e\u0437\u0432\u043e\u043b\u0443 \u043d\u0430 \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f\"}'>p. 3) performance of construction works without obtaining a permit for their performance<\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043d\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0430\u0445, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u0441\u0435\u0440\u0435\u0434\u043d\u0456\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04212)\"}'>on objects that, according to the class of consequences (responsibility), belong to objects with medium consequences (\u0421\u04212)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"370 \u043f\u043c\\n\u0437 01.01.20\u2013 1 544 010\"}'>370 pm<br \/>\nfrom 01.01.20 \u2013 1,544,010<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043d\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0430\u0445, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0456\u0437 \u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04213)\"}'>on objects that, according to the class of consequences (responsibility), belong to objects with significant consequences (SS3)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"900 \u043f\u043c\\n\u0437 01.01.20\u2013 3755700\"}'>900 PM<br \/>\nfrom 01.01.20 \u2013 3755700<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f.4) \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u044f \u0430\u0431\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u0430, \u043d\u0435 \u043f\u0440\u0438\u0439\u043d\u044f\u0442\u0438\u0445 \u0432 \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u044e, \u0430 \u0442\u0430\u043a\u043e\u0436 \u043d\u0430\u0432\u0435\u0434\u0435\u043d\u043d\u044f \u043d\u0435\u0434\u043e\u0441\u0442\u043e\u0432\u0456\u0440\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445 \u0443 \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u0457 \u043f\u0440\u043e \u0433\u043e\u0442\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u043e\u0431\u2019\u0454\u043a\u0442\u0430 \u0434\u043e \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u0457 \u0447\u0438 \u0432 \u0430\u043a\u0442\u0456 \u0433\u043e\u0442\u043e\u0432\u043d\u043e\u0441\u0442\u0456 \u043e\u0431\u2019\u0454\u043a\u0442\u0430 \u0434\u043e \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u0457, \u0432\u0447\u0438\u043d\u0435\u043d\u0456 \u0449\u043e\u0434\u043e\\n\\n\u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u043d\u0435\u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04211),\"}'>item 4) operation or use of construction objects that have not been put into operation, as well as the provision of inaccurate data in the declaration of the object&#8217;s readiness for operation or in the act of the object&#8217;s readiness for operation, made in relation to objects that by the class of consequences (responsibility) belong to objects with minor consequences (\u0421\u04211),<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"36 \u043f\u043c\\n\u0437 01.01.20 \u2013 150 228\"}'>36 pm<br \/>\nfrom 01.01.20 \u2013 150,228<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u0441\u0435\u0440\u0435\u0434\u043d\u0456\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04212)\"}'>objects that, by the class of consequences (responsibility), belong to objects with medium consequences (\u0421\u04212)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"370 \u043f\u043c\\n\u0437 01.01.20 \u2013 1544010\"}'>370 pm<br \/>\nfrom 01.01.20 \u2013 1544010<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04213)\"}'>objects that, according to the class of consequences (responsibility), belong to objects with significant consequences (SS3)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"900 \u043f\u043c\\n\u0437 01.01.20\u2013 3755700\"}'>900 PM<br \/>\nfrom 01.01.20 \u2013 3755700<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f.5) \u043d\u0435\u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u043e\u043c \u0437\u0434\u0456\u0439\u0441\u043d\u0435\u043d\u043d\u044f \u0442\u0435\u0445\u043d\u0456\u0447\u043d\u043e\u0433\u043e \u043d\u0430\u0433\u043b\u044f\u0434\u0443 \u0443 \u0432\u0438\u043f\u0430\u0434\u043a\u0430\u0445, \u044f\u043a\u0449\u043e \u0442\u0430\u043a\u0438\u0439 \u043d\u0430\u0433\u043b\u044f\u0434 \u0454 \u043e\u0431\u043e\u0432\u2019\u044f\u0437\u043a\u043e\u0432\u0438\u043c \u0437\u0433\u0456\u0434\u043d\u043e \u0456\u0437 \u0437\u0430\u043a\u043e\u043d\u043e\u0434\u0430\u0432\u0441\u0442\u0432\u043e\u043c\"}'>p.5) failure to provide technical supervision by the customer in cases where such supervision is mandatory according to legislation<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"40 \u043f\u043c\\n\u0437 01.01.20 \u2013 166 920\"}'>40 pm<br \/>\nfrom 01.01.20 \u2013 166,920<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 6) \u043d\u0435\u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u043e\u043c \u0437\u0434\u0456\u0439\u0441\u043d\u0435\u043d\u043d\u044f \u0430\u0432\u0442\u043e\u0440\u0441\u044c\u043a\u043e\u0433\u043e \u043d\u0430\u0433\u043b\u044f\u0434\u0443 \u0443 \u0432\u0438\u043f\u0430\u0434\u043a\u0430\u0445, \u044f\u043a\u0449\u043e \u0442\u0430\u043a\u0438\u0439 \u043d\u0430\u0433\u043b\u044f\u0434 \u0454 \u043e\u0431\u043e\u0432\u2019\u044f\u0437\u043a\u043e\u0432\u0438\u043c \u0437\u0433\u0456\u0434\u043d\u043e \u0456\u0437 \u0437\u0430\u043a\u043e\u043d\u043e\u0434\u0430\u0432\u0441\u0442\u0432\u043e\u043c\"}'>p. 6) failure of the customer to provide copyright supervision in cases where such supervision is mandatory according to legislation<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"50 \u043f\u043c\\n\u0437 01.01.20 \u2013 208 650\"}'>50 pm<br \/>\nfrom 01.01.20 \u2013 208,650<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 7) \u043d\u0435\u043f\u043e\u0434\u0430\u043d\u043d\u044f \u0447\u0438 \u043d\u0435\u0441\u0432\u043e\u0454\u0447\u0430\u0441\u043d\u0435 \u043f\u043e\u0434\u0430\u043d\u043d\u044f \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u043e\u043c \u0456\u043d\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u0457 \u043f\u0440\u043e \u043f\u0435\u0440\u0435\u0434\u0430\u0447\u0443 \u043f\u0440\u0430\u0432\u0430 \u043d\u0430 \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0430 \u0456\u043d\u0448\u043e\u043c\u0443 \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a\u0443, \u0437\u043c\u0456\u043d\u0443 \u0433\u0435\u043d\u0435\u0440\u0430\u043b\u044c\u043d\u043e\u0433\u043e \u043f\u0456\u0434\u0440\u044f\u0434\u043d\u0438\u043a\u0430 \u0447\u0438 \u043f\u0456\u0434\u0440\u044f\u0434\u043d\u0438\u043a\u0430, \u043e\u0441\u0456\u0431, \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u0438\u0445 \u0437\u0430 \u043f\u0440\u043e\u0432\u0435\u0434\u0435\u043d\u043d\u044f \u0430\u0432\u0442\u043e\u0440\u0441\u044c\u043a\u043e\u0433\u043e \u0456 \u0442\u0435\u0445\u043d\u0456\u0447\u043d\u043e\u0433\u043e \u043d\u0430\u0433\u043b\u044f\u0434\u0443, \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u0438\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u0432\u0446\u0456\u0432 \u0440\u043e\u0431\u0456\u0442, \u0430 \u0442\u0430\u043a\u043e\u0436 \u043f\u0440\u043e \u043a\u043e\u0440\u0438\u0433\u0443\u0432\u0430\u043d\u043d\u044f \u043f\u0440\u043e\u0435\u043a\u0442\u043d\u043e\u0457 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u0457 \u0443 \u0432\u0438\u043f\u0430\u0434\u043a\u0430\u0445, \u043a\u043e\u043b\u0438 \u043f\u043e\u0434\u0430\u043d\u043d\u044f \u0442\u0430\u043a\u043e\u0457 \u0456\u043d\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u0457 \u0454 \u043e\u0431\u043e\u0432\u2019\u044f\u0437\u043a\u043e\u0432\u0438\u043c \u0437\u0433\u0456\u0434\u043d\u043e \u0456\u0437 \u0437\u0430\u043a\u043e\u043d\u043e\u0434\u0430\u0432\u0441\u0442\u0432\u043e\u043c\"}'>p. 7) non-submission or untimely submission by the customer of information on the transfer of the right to build the object to another customer, change of the general contractor or contractor, persons responsible for the author&#8217;s and technical supervision, responsible executors of works, as well as on the correction of project documentation in cases where the submission of such information is mandatory according to the law<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"20 \u043f\u043c\\n\u0437 01.01.20 \u2013 83 460\"}'>20 pm<br \/>\nfrom 01.01.20 \u2013 83,460<\/td>\n<\/tr>\n<tr>\n<td colspan=\"1\" data-sheets-value='{\"1\":2,\"2\":\"\u0421\u0443\u0431\u2019\u0454\u043a\u0442\u0438 \u043c\u0456\u0441\u0442\u043e\u0431\u0443\u0434\u0443\u0432\u0430\u043d\u043d\u044f, \u044f\u043a\u0456 \u0432\u0438\u043a\u043e\u043d\u0443\u044e\u0442\u044c \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0456 \u0440\u043e\u0431\u043e\u0442\u0438\"}' rowspan=\"5\">\n<div>Subjects of urban planning that perform construction work<\/div>\n<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 1) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u043f\u0456\u0434\u0433\u043e\u0442\u043e\u0432\u0447\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f\"}'>p. 1) performance of preparatory works without notification of the start of their performance<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"10 \u043f\u043c\\n\u0437 01.01.20 \u2013 41 730\"}'>10 pm<br \/>\nfrom 01.01.20 \u2013 41,730<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f.2) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0449\u043e\u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432, \u0431\u0443\u0434\u0456\u0432\u043d\u0438\u0446\u0442\u0432\u043e \u044f\u043a\u0438\u0445 \u0437\u0434\u0456\u0439\u0441\u043d\u044e\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u043f\u0456\u0434\u0441\u0442\u0430\u0432\u0456 \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0433\u043e \u043f\u0430\u0441\u043f\u043e\u0440\u0442\u0430\"}'>p.2) execution of construction works without notification of the start of their execution in relation to objects, the construction of which is carried out on the basis of a construction passport<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"10 \u043f\u043c\\n\u0437 01.01.20 \u2013 41 730\"}'>10 pm<br \/>\nfrom 01.01.20 \u2013 41,730<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f. 3) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043d\u0430\u043f\u0440\u0430\u0432\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0442\u0430\u043a\u0438\u0445 \u0440\u043e\u0431\u0456\u0442\\n\u043d\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0430\u0445, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u043d\u0435\u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04211),\"}'>p. 3) execution of construction works without sending a notification about the start of execution of such works<br \/>\non objects that, according to the class of consequences (responsibility), belong to objects with insignificant consequences (\u0421\u04211),<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"36 \u043f\u043c\\n\u0437 01.01.20 \u2013 150 228\"}'>36 pm<br \/>\nfrom 01.01.20 \u2013 150,228<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043f.4) \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0431\u0435\u0437 \u043e\u0442\u0440\u0438\u043c\u0430\u043d\u043d\u044f \u0434\u043e\u0437\u0432\u043e\u043b\u0443 \u043d\u0430 \u0457\u0445 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f:\\n\u043d\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0430\u0445, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0437 \u0441\u0435\u0440\u0435\u0434\u043d\u0456\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04212)\"}'>p. 4) execution of construction works without obtaining a permit for their execution:<br \/>\non objects that, according to the class of consequences (responsibility), belong to objects with medium consequences (\u0421\u04212)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"370 \u043f\u043c\\n\u0437 01.01.20 \u2013 1544010\"}'>370 pm<br \/>\nfrom 01.01.20 \u2013 1544010<\/td>\n<\/tr>\n<tr>\n<td data-sheets-value='{\"1\":2,\"2\":\"\u043d\u0430 \u043e\u0431\u2019\u0454\u043a\u0442\u0430\u0445, \u0449\u043e \u0437\u0430 \u043a\u043b\u0430\u0441\u043e\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0456\u0432 (\u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u043e\u0441\u0442\u0456) \u043d\u0430\u043b\u0435\u0436\u0430\u0442\u044c \u0434\u043e \u043e\u0431\u2019\u0454\u043a\u0442\u0456\u0432 \u0456\u0437 \u0437\u043d\u0430\u0447\u043d\u0438\u043c\u0438 \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u0430\u043c\u0438 (\u0421\u04213)\"}'>on objects that, according to the class of consequences (responsibility), belong to objects with significant consequences (SS3)<\/td>\n<td data-sheets-value='{\"1\":2,\"2\":\"900 \u043f\u043c\\n\u0437 01.01.20\u2013 3755700\"}'>900 PM<br \/>\nfrom 01.01.20 \u2013 3755700<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>During the construction of buildings and structures of the CC1 category, a &#8220;notice of the start of construction work&#8221; is submitted to the architectural inspection(through the developer&#8217;s electronic office or through the &#8220;Transparent Office&#8221; TsNAP). The message is registered within 10 working days, after whichthe developer is notified of a unique number or a &#8220;Rejection&#8221;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction permit - UBPR<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ubpr.com.ua\/en\/building-permit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction permit - UBPR\" \/>\n<meta property=\"og:description\" content=\"During the construction of buildings and structures of the CC1 category, a &#8220;notice of the start of construction work&#8221; is submitted to the architectural inspection(through the developer&#8217;s electronic office or through the &#8220;Transparent Office&#8221; TsNAP). The message is registered within 10 working days, after whichthe developer is notified of a unique number or a &#8220;Rejection&#8221;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ubpr.com.ua\/en\/building-permit\/\" \/>\n<meta property=\"og:site_name\" content=\"UBPR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ubpr.com.ua\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-02T07:27:12+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/ubpr.com.ua\/#organization\",\"name\":\"UBPR \u0423\u043a\u0440\u0411\u0443\u0434\u041f\u0440\u043e\u0435\u043a\u0442\u0420\u0435\u0441\u0442\u0430\u0432\u0440\u0430\u0446\u0438\u044f\",\"url\":\"https:\/\/ubpr.com.ua\/\",\"sameAs\":[\"https:\/\/www.instagram.com\/ubpr.com.ua\",\"https:\/\/www.facebook.com\/ubpr.com.ua\"],\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ubpr.com.ua\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ubpr.com.ua\/wp-content\/uploads\/2023\/02\/cropped-photo_5206635316906147912_y.jpg\",\"contentUrl\":\"https:\/\/ubpr.com.ua\/wp-content\/uploads\/2023\/02\/cropped-photo_5206635316906147912_y.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"UBPR \u0423\u043a\u0440\u0411\u0443\u0434\u041f\u0440\u043e\u0435\u043a\u0442\u0420\u0435\u0441\u0442\u0430\u0432\u0440\u0430\u0446\u0438\u044f\"},\"image\":{\"@id\":\"https:\/\/ubpr.com.ua\/#\/schema\/logo\/image\/\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ubpr.com.ua\/#website\",\"url\":\"https:\/\/ubpr.com.ua\/\",\"name\":\"UBPR\",\"description\":\"Project work of any complexity at a weighted price in a short period of time\",\"publisher\":{\"@id\":\"https:\/\/ubpr.com.ua\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ubpr.com.ua\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ubpr.com.ua\/en\/building-permit\/\",\"url\":\"https:\/\/ubpr.com.ua\/en\/building-permit\/\",\"name\":\"Construction permit - UBPR\",\"isPartOf\":{\"@id\":\"https:\/\/ubpr.com.ua\/#website\"},\"datePublished\":\"2020-03-20T12:06:06+00:00\",\"dateModified\":\"2020-09-02T07:27:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ubpr.com.ua\/en\/building-permit\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ubpr.com.ua\/en\/building-permit\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ubpr.com.ua\/en\/building-permit\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\/\/ubpr.com.ua\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction permit\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction permit - UBPR","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ubpr.com.ua\/en\/building-permit\/","og_locale":"en_US","og_type":"article","og_title":"Construction permit - UBPR","og_description":"During the construction of buildings and structures of the CC1 category, a &#8220;notice of the start of construction work&#8221; is submitted to the architectural inspection(through the developer&#8217;s electronic office or through the &#8220;Transparent Office&#8221; TsNAP). The message is registered within 10 working days, after whichthe developer is notified of a unique number or a &#8220;Rejection&#8221;","og_url":"https:\/\/ubpr.com.ua\/en\/building-permit\/","og_site_name":"UBPR","article_publisher":"https:\/\/www.facebook.com\/ubpr.com.ua","article_modified_time":"2020-09-02T07:27:12+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/ubpr.com.ua\/#organization","name":"UBPR \u0423\u043a\u0440\u0411\u0443\u0434\u041f\u0440\u043e\u0435\u043a\u0442\u0420\u0435\u0441\u0442\u0430\u0432\u0440\u0430\u0446\u0438\u044f","url":"https:\/\/ubpr.com.ua\/","sameAs":["https:\/\/www.instagram.com\/ubpr.com.ua","https:\/\/www.facebook.com\/ubpr.com.ua"],"logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ubpr.com.ua\/#\/schema\/logo\/image\/","url":"https:\/\/ubpr.com.ua\/wp-content\/uploads\/2023\/02\/cropped-photo_5206635316906147912_y.jpg","contentUrl":"https:\/\/ubpr.com.ua\/wp-content\/uploads\/2023\/02\/cropped-photo_5206635316906147912_y.jpg","width":1200,"height":1200,"caption":"UBPR \u0423\u043a\u0440\u0411\u0443\u0434\u041f\u0440\u043e\u0435\u043a\u0442\u0420\u0435\u0441\u0442\u0430\u0432\u0440\u0430\u0446\u0438\u044f"},"image":{"@id":"https:\/\/ubpr.com.ua\/#\/schema\/logo\/image\/"}},{"@type":"WebSite","@id":"https:\/\/ubpr.com.ua\/#website","url":"https:\/\/ubpr.com.ua\/","name":"UBPR","description":"Project work of any complexity at a weighted price in a short period of time","publisher":{"@id":"https:\/\/ubpr.com.ua\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ubpr.com.ua\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ubpr.com.ua\/en\/building-permit\/","url":"https:\/\/ubpr.com.ua\/en\/building-permit\/","name":"Construction permit - UBPR","isPartOf":{"@id":"https:\/\/ubpr.com.ua\/#website"},"datePublished":"2020-03-20T12:06:06+00:00","dateModified":"2020-09-02T07:27:12+00:00","breadcrumb":{"@id":"https:\/\/ubpr.com.ua\/en\/building-permit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ubpr.com.ua\/en\/building-permit\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ubpr.com.ua\/en\/building-permit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/ubpr.com.ua\/"},{"@type":"ListItem","position":2,"name":"Construction permit"}]}]}},"_links":{"self":[{"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/pages\/1443"}],"collection":[{"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/comments?post=1443"}],"version-history":[{"count":16,"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/pages\/1443\/revisions"}],"predecessor-version":[{"id":3516,"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/pages\/1443\/revisions\/3516"}],"wp:attachment":[{"href":"https:\/\/ubpr.com.ua\/en\/wp-json\/wp\/v2\/media?parent=1443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}